| No. |
COURSE |
Date |
Code |
Fees (Excluding GST) |
| 1. |
Installation Procedures For VRVIII-Q System (For Replacement Use) |
25/10/2011 ~ 25/10/2011 |
R11-32 |
S$75.00 |
| 1. |
Installation Procedures For VRVIII-Q System (For Replacement Use) |
5/1/2012 ~ 5/1/2012 |
R11-32 |
S$75.00 |
| 2. |
Testing & Commissioning For VRV System |
18/10/2011 ~ 18/10/2011 |
R11-33 |
S$150.00 |
| 3. |
Troubleshooting Of VRV System |
13/10/2011 ~ 13/10/2011 |
R11-35 |
S$150.00 |
| 3. |
Troubleshooting Of VRV System |
17/1/2012 ~ 17/1/2012 |
R11-35 |
S$150.00 |
| 4. |
Installation Guide For SuperMulti-HW System |
1/11/2011 ~ 1/11/2011 |
R11-12 |
S$75.00 |
| 4. |
Installation Guide For SuperMulti-HW System |
21/2/2012 ~ 21/2/2012 |
R11-12 |
S$75.00 |
| 5. |
APPLICATIONS OF i-TOUCH CONTROLLER |
17/11/2011 ~ 17/11/2011 |
R11-64 |
S$150.00 |
| 5. |
APPLICATIONS OF i-TOUCH CONTROLLER |
2/3/2012 ~ 2/3/2012 |
R11-64 |
S$150.00 |
| 6. |
APPLICATIONS OF i-MANAGER SYSTEM |
1/12/2011 ~ 1/12/2011 |
R11-74 |
S$150.00 |
| 7. |
AHU Maintenance |
13/12/2011 ~ 13/12/2011 |
R11-54 |
S$150.00 |
| 9. |
BASIC OPERATION AND MAINTENANCE OF AN AIR-COOLED CHILLER (UWAP MODEL) |
27/3/2012 ~ 28/3/2012 |
R11-44 |
S$500.00 |
| 11. |
WSQ - Determine Basic Operating Conditions And Maintenance For Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
22/11/2011 ~ 23/11/2011 |
W11-04 |
S$Check with Provider |
| 11. |
WSQ - Determine Basic Operating Conditions And Maintenance For Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
6/3/2012 ~ 7/3/2012 |
W11-04 |
S$Check with provider |
| 12. |
WSQ - Determine Basic Operating Conditions And Maintenance For Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
24/11/2011 ~ 24/11/2004 |
W11-04 |
S$Check with Provider |
| 12. |
WSQ - Determine Basic Operating Conditions And Maintenance For Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
8/3/2012 ~ 8/3/2012 |
W11-04 |
S$Check with provider |
| 13. |
WSQ - Install And Commission Single Phase Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
6/12/2011 ~ 7/12/2011 |
W11-12 |
S$Check with Provider |
| 13. |
WSQ - Install And Commission Single Phase Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
27/2/2012 ~ 28/2/2012 |
W11-12 |
S$Check With Provider |
| 14. |
WSQ - Install And Commission Single Phase Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
8/12/2011 ~ 8/12/2011 |
W11-12 |
S$Check with Provider |
| 14. |
WSQ - Install And Commission Single Phase Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
29/2/2012 ~ 29/2/2012 |
W11-12 |
S$Check With Provider |
| 15. |
WSQ - Apply Proper Installation Practice For Direct-Expansion Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
20/12/2011 ~ 20/12/2011 |
W11-32 |
S$Check With Provider |
| 15. |
WSQ - Apply Proper Installation Practice For Direct-Expansion Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
13/3/2012 ~ 13/3/2012 |
W11-32 |
S$Check with Provider |
| 16. |
WSQ - Apply Proper Installation Practice For Direct-Expansion Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
25/5/2011 ~ 25/5/2011 |
WSQ |
S$Check With Provider |
| 16. |
WSQ - Apply Proper Installation Practice For Direct-Expansion Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
21/12/2011 ~ 21/12/2011 |
W11-32 |
S$Check With Provider |
| 17. |
WSQ - Diagnose And Rectify Faults In Direct-Expansion Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
10/1/2012 ~ 11/1/2012 |
W11-15 |
S$Check With Provider |
| 17. |
WSQ - Diagnose And Rectify Faults In Direct-Expansion Air-conditioning system (*FLP; pls check with provider before submitting the application form) |
20/3/2012 ~ 21/3/2012 |
W11-15 |
S$Check With Provider |
| 18. |
WSQ - Diagnose And Rectify Faults In Direct-Expansion Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
12/1/2012 ~ 12/1/2012 |
W11-15 |
S$Check With Provider |
| 18. |
WSQ - Diagnose And Rectify Faults In Direct-Expansion Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
22/3/2012 ~ 22/3/2012 |
W11-15 |
S$Check With Provider |
| 19. |
WSQ - Select Variable Refrigerant Flow Air-conditioning System (*FLP; pls check with provider before submitting the application form) |
1/2/2012 ~ 2/2/2012 |
W11-31 |
S$Check With Provider |
| 20. |
WSQ - Select Variable Refrigerant Flow Air-conditioning System (*AOP, pls check with provider before submitting the application form) |
3/2/2012 ~ 3/2/2012 |
W11-31 |
S$Check With Provider |
| 21. |
WSQ - Apply Fundamental design Principles Of Chilled Water (*FLP; pls check with provider before submitting the application form) |
7/2/2012 ~ 8/2/2012 |
W11-40 |
S$Check With Provider |
| 22. |
WSQ - Apply Fundamental design Principles Of Chilled Water (*AOP, pls check with provider before submitting the application form) |
9/2/2012 ~ 9/2/2012 |
W11-40 |
S$Check With Provider |
| 23. |
WSQ - Determine Size Of Air Duct And Water Piping In Chiller (*FLP; pls check with provider before submitting the application form) |
14/2/2012 ~ 15/2/2012 |
W11-41 |
S$Check With Provider |
| 24. |
WSQ - Determine Size Of Air Duct And Water Piping In Chiller (*AOP, pls check with provider before submitting the application form) |
16/2/2012 ~ 16/2/2012 |
W11-41 |
S$Check With Provider |